An incident can quickly result in an unmanageable situation unless effective fire protection measures are in place. The fire protection equipment must be reliable even under extreme conditions because fire safety in this sector is crucial. Periodic testing of the equipment in an effective and environmentally friendly manner is essential. Our specialists have specific knowledge of your sector and will be pleased to share ideas on the best solution for your situation. And they will give you a clear idea of the costs, not just of purchase but also of preventive and corrective maintenance.
Our approach
Fire safety always consists of the right balance between Intervention, Installation and Instruction, with you at the center. We explain step by step what our Installation-process contains.
Risk assessment & action plan
The first step is to make a risk assessment based on architectural, systems and organisational aspects. Every building has its own risks, which we specify. The report identifies possible solutions in general terms plus an estimate of the cost if required. The solutions are worked out in the action plan, which also describes the implementation in the process or organisation.
Preliminary design, calculation & engineering
After approval of the action plan, the design work can begin. The final cost estimate (quotation) is also made at this stage. Once the quotation has been agreed, we can start on the detailed design. The project assignment is signed by both the client and the contractor. In many cases, the drawings and design calculations also need to be approved by inspection bodies.
Installation, commissioning & certification
Clear agreements are made regarding planning, lead times, implementation and delivery. At the end of the project, we will submit a maintenance agreement for one or more years. Fire safety systems are usually delivered with a certificate. Sometimes that is just a product certificate, but often there is also an inspection certificate from an accredited inspection body. The inspection involves checking that the system matches the approved design and is functional.
Short-term projects / small works
The Short-term Projects / Small Works department has been specifically established to swiftly and adaptably execute tasks with agility. This work encompasses tasks stemming from residual points identified during maintenance or inspections, system modifications required following building renovations or expansions, replacement of parts or entire installations, as well as the installation of new, albeit small-scale, fire protection systems.
Our services
See all servicesCase
Expansion of noord natie terminals with a full fire safety concept
Noord Natie Terminals (NNT) offers tank storage in various sizes. The volume of the tanks varies from 30 m3 to 8300 m3. The terminal has berths for seagoing and inland vessels. The terminal is connected to the railwal. There are several locations for loading and unloading tankers, tank containers and flexitanks. NNT is also an excellent partner for direct transhipment thanks to its excellent accessibility on the quay. Safety has the highest highest priority at NNT.